Nocktane

Accountability

Tracker

Roadmap watch over Nockchain promises vs reality.

Roadmap Tracker

Completed Current Planned Removed
ItemFirst listedStatus nowTarget nowQuarters slippedRoadmap snapshots
Useful Inference Routing ProtocolQ4 2026 CurrentQ4 202602026-09-30: Q4 20262026-10-24, live: Q4 2026
Bridge WithdrawalsQ1 2026 PlannedQ1 202742026-01-18: Q1 20262026-06-16: Q2 20262026-09-30: Q1 20272026-10-24, live: Q1 2027
Native Token StandardH2 2026 PlannedQ3 202732026-01-18: H2 20262026-06-16: H1 20272026-09-30: Q3 20272026-10-10, live: Q3 2027
Private DeFi FoundationsH2 2026 PlannedQ3 202732026-01-18: H2 20262026-06-16: H2 20272026-09-30: Q3 20272026-10-10, live: Q3 2027
ZK Compute MarketsQ1 2027 PlannedQ4 202732026-06-16: Q1 20272026-09-30: Q4 20272026-10-10, live: Q4 2027
Full Nock ZKVM CompletionQ3 2026 PlannedQ1 202722026-06-16: Q3 20262026-09-30: Q1 20272026-10-10, live: Q1 2027
ZK Verification OpcodeQ3 2026 PlannedQ1 202722026-06-16: Q3 20262026-09-30: Q1 20272026-10-10, live: Q1 2027
Privacy Pool AppQ4 2026 PlannedQ2 202722026-06-16: Q4 20262026-09-30: Q2 20272026-10-10, live: Q2 2027
Post-Quantum Secure SignaturesH1 2027 PlannedQ4 202722026-06-16: H1 20272026-09-30: Q4 20272026-10-10, live: Q4 2027
Forced Data AvailabilityQ4 2026 PlannedQ1 202712026-06-16: Q4 20262026-09-30: Q1 20272026-10-10, live: Q1 2027
Demand Paging (PMA)Q1 2026 CompletedQ2 202612026-01-18: Q1 20262026-06-16: Q2 20262026-10-10, live: Q2 2026
Networking UpgradeQ1 2026 CompletedQ2 202612026-01-18: Q1 20262026-06-16: Q2 20262026-10-10, live: Q2 2026
AI Compute Network LaunchJun 2026 CompletedAug 202612026-06-16: Jun 20262026-09-30: Aug 20262026-10-10, live: Aug 2026
Protocol UpgradeQ1 2026 CompletedQ1 202602026-01-18: Q1 20262026-06-16: Q1 20262026-10-10, live: Q1 2026
Phase 2 Consensus Upgrade to ASERT6 May 2026 Completed6 May 202602026-06-16: 6 May 20262026-10-10, live: 6 May 2026
Intent Script ExpansionQ1 2026 RemovedRemovedn/a2026-01-18: Q1 20262026-06-16: absent2026-10-10, live: absent
Optimistic ExecutionQ2 2026 RemovedRemovedn/a2026-01-18: Q2 20262026-06-16: absent2026-10-10, live: absent
Fraud Proof SystemQ2 2026 RemovedRemovedn/a2026-01-18: Q2 20262026-06-16: absent2026-10-10, live: absent
Oracle PrimitivesQ2 2026 RemovedRemovedn/a2026-01-18: Q2 20262026-06-16: absent2026-10-10, live: absent
Prediction MarketsQ2 2026 RemovedRemovedn/a2026-01-18: Q2 20262026-06-16: absent2026-10-10, live: absent
Private TransactionsH2 2026 RemovedRemovedn/a2026-01-18: H2 20262026-06-16: absent2026-10-10, live: absent

Quarters slipped counts the three-month periods between the first date listed and today's target. A month counts as its quarter, H1 as Q2 and H2 as Q4. Each date links to a saved copy of the roadmap on web.archive.org. Four copies from 2026 exist (Jan 18, Feb 8, Jun 16 and Sep 30), so we only see the targets listed on those days. Items dated before 2026 stayed the same and are left out.

Fork Notice Log

The July 25 goal →

Notice is the time between the first public mention of an upgrade's block (a pull request, a commit to master, a tag or an official post) and the moment that block arrives on Nockscan. On July 25, 2026, the @nockchain account set a clear goal: every consensus-critical upgrade gets a public testnet, review by multiple teams, a published audit and an activation height announced with real notice. Emergency marks fixes for mining exploits.

ForkHeightFirst public signalActivatedNotice, hoursEmergencySummarySources
Security batch 3, block 170,000170,000PR #221 opened with height 170,000 in its title; merged at 15:22:01 UTC84.7NoRe-anchored both difficulty lanes (ZK reference 100 billion Tip5 hashes/s, AI reference 20 EMAC/s), selected updated AI proof admission and shipped node, networking and wallet hardening. The longest notice of any fork so far. Bridge withdrawal processing stays disabled.PR #221: Security batch 3, coordinated consensus upgrade at height 170,000docs/AI_POW_CUTOVER.md at commit 7fa37163c9017-anthropos.md, Subsequent reset at height 170,000Nockscan API block 170000
Block 154,500 reset154,500PR #209 opened; merged 14.3 hours before activation14.8NoRe-anchored both difficulty lanes, revised the ZK reference rate and updated AI proof verification. The cutover notes say bridge withdrawal processing must remain disabled.PR #209: Coordinate upgrade at height 154500docs/AI_POW_CUTOVER.md017-anthropos.md, Subsequent reset at height 154500Nockscan API block 154500
Anthropos 0.1.17147,500PR #187 opened with height 147,500; merged 8.2 hours before activation10.7NoZK proof version 5 and a new block split: 70% AI, 30% ZK. Realized AI share ran at 75.9% until the next reset.PR #187: feat(consensus): add Anthropos ZK proof version 5changelog/protocol/017-anthropos.mdNockscan API block 147500
Logos 0.1.16126,000@nockchain post naming block 126,000; code merged 71.8 hours before activation77.1NoAdded the AI proof-of-work lane (a Pearl-compatible INT8 matmul puzzle) beside ZK mining, targeting 30% AI and 70% ZK blocks. Earlier targets of 114,300 and 122,000 passed without activation.@nockchain: AI Compute Network goes live Friday (8/14) at Block 126,000@nockchain article: Logos Upgrade: Testnet Launch & Bug Bounty (retarget to 122,000)Logan Allen article: Announcing National Compute (114,300)PR #145: ai-pow-puzzle: Logos proposal (release candidate)Commit 9e98a16790: consensus: set Logos cadence to 30/70changelog/protocol/016-logos.mdcrates/ai-pow/docs/2026-07-29_TIME_BANKED_FORK_EXPLOIT.mdNockscan API block 126000Nockscan API block 126859
Zoe 0.1.15119,400PR #149 merged to master naming 119,400 (a push to the open pull request had named it at 18:24 UTC)2.7YesEmergency fix for a trace-reuse mining exploit. The pull request opened proposing block 120,400. Activated two days before the Aug 6 target listed in PROTOCOL.md.PR #149: fix(consensus): introduce Zoe proof v3 hardeningCommit 6081793562: finalize Zoe cutover at height 119400GitHub activity log, eamsden/nockchain branch eamsden/zkvm-hardness-review (push 18:24:21Z)changelog/protocol/015-zoe.md@nockchain, State of the Network (2026-08-05)Nockscan API block 119400
Block 112,500 fix112,500Commit pushed directly to master without a pull request5.3YesClosed a mining channel that let one proof yield extra work candidates (zero-padded composition polynomials) and re-anchored the ZK difficulty target. No changelog file or PROTOCOL.md entry exists for it.Commit 292b84aca8: activate zkpow and ASERT fork at 112500GitHub activity log, refs/heads/master (push timestamps)@nockchain, State of the Network: Testnet live, Bug Bounty, Zoe Upgrade & nockscan (2026-08-05)Nockscan API block 112500

Bridge Watch

Updated Oct 24, 2026, 21:53 UTC

NOCK in the Base bridge lock

1.598B

Mined supply

2.366B

Share of mined supply locked

67.6%

Withdrawals back to Nockchain

Disabled

Balance of the Base bridge lock address divided by mined supply, the sum of all unspent notes (both from Nockscan). Wrapped NOCK on Base: 0x9B5E262cF9bb04869ab40b19AF91D2dc85761722. Data: Nockscan ·Withdrawal pull requests on GitHub

Fund Watch

Updated Oct 24, 2026, 21:53 UTC

Received

43.12M NOCK

Sent

12.94M NOCK

Balance

30.19M NOCK

The protocol fund receives 20% of every block reward since block 65,500. Per Nock Community Co.'s documentation, the protocol fund is administered collectively and disbursements need a quorum of signatories from NCC, NockBox, Southwest Pool Supply Co. and Lambda Collective. Fund address: 9EhcJiGhAPcWLYrR9DL4ZPjU2Z9XT6FT2ZFkEEwmSQv7ES2TMC7p6Up.NCC documentation · Data: Nockscan